Assignment 1: Experiencing Construction

 

This is our first project for the Building Construction module, and it is a group project which we are required to conduct one or more site visits (preferably at least 2 sites) and study about the construction stages and processes, and then generate a report in group to present our studies. Each of our member is responsible for a stage of construction, and for me, I'm responsible for the site introduction, and the preliminaries work.

Our group had went for visits on two sites. Our first site is at Rawang, developed by the Majestic group, and the second site at Puchong, which is developed by the IOI Properties group. 

Signboards at the entry of site: includes developers and site information.

< Hoardings: as boundary of site and security purposes.

Site office >

 Inside the site office :

(In the site office) Samples of products used as quality control.

< The rebar fabrication yard.

Rebar Specifications >

< Rebar bending machine

< Labour Shed (Worker's accomodation)

< Safety Signboards

Vehicle washing area >

< Temporary toilets

< Covered storage

< Temporary storage (by stacking)

< Guardhouse at entrance

Lifting straps >

< Fogging to eliminate/prevent breeding of mosquitoes

Thread to control accurate and neat columns >

< Staircase formwork

V Starter bar